Planning a production Order

Planning a production Order.
The first step of the planning process is to create or generate a production order which can only be created for products with a production BOM. Production orders can be generated in three ways; manually, through a sale order, via Smart Reordering.
Check if the required component and resources are available to work out how long it will take to process. Planning the production order finalizes which components and resources are needed (Finished goods can also be included as a component in the production order).
Creating an order Manually.
Main menu>Production>New Production Order.

1. To create an order manually, go to Production>New ‘Production Order’. To complete planning a production order which is a generated production order that has been generated by the system, go to Production>Production order.


2. Fill in the document header fields; SKU, Product Name, Work in progress Account, Finished Goods account and Quantity are required fields.

3. To distinguish production order Comma-separated Tags can be added.

4. Select capacity calculation will take place from Planned date forward or from Required by date backward.

5. Release Date will be calculated and filled in automatically from the capacity calculations.

6. Click the Production BOM button, the Production Order tab displays the Production BOM set up for the finished good to be produced in Dears Inventory.

7. quantity and operation durations of the resource and components are calculated to produce the number of finished goods specified in the Order details>Quantity filed.

8. The number of components and resources can be edited in the production order, including adding components and resources for Draft, planned, and released orders.


9. Cost and operation cycle duration are calculated automatically.


10. Dear check the availability of the components:
· Availability is checked in the shop floor location.
· The available number of items at the shop floor, components, in Transit, and on order.
· The component is listed as not available if neither location has the component in stock.

11. Click Authorise to complete this stage. Authorized production order will automatically have status released if the production order Set order Status to is set to release.

12. This stage allows you to choose to split the production order by clicking Split before Authorise which opens a dialogue box where you choose how many units of the finished goods to produce in each order.

13. This created a new production order with status Draft.

14.Click’+ Production Run’ which should display a window pop-up of Create Production Run. Enter the quantity to produce you want to make. To create another production run click ‘+Production run’ at the bottom of the window pop-up. Click Run.

15. To begin the Production go to Production run NUM and click start.


16. By clicking complete a window pop-up should be displayed for ‘output’. This shows the product produced, Wastage Produced, total produce, units, receive date and location.


17.By clicking complete again on the product order window, it should complete the order and provide a journal of the completed order.

CONTACT US

Fill out this field
Please enter a valid email address.
Fill out this field
Enter the equation result to proceed 16 - 3 = ?
Enter the equation result to proceed
Shop floors and Locations
Types of RMA scrappage Part 6.